|
Maudaha Dam Automation Project
|
|
Current Data Report
|
|
Data is Updated on:
13/1/2026 at 5:10:39
|
|
|
Dam Parameters
|
|
Reservoir U/S Level :
|
148.72
|
Mtrs.
|
Reservoir D/S Level :
|
128.31
|
Mtrs.
|
|
Gross Contents :
|
200.0000
|
McuM
|
Live Contents :
|
179.0000
|
McuM
|
|
% Live Contents
:
|
100.0000
|
%
|
Discharge Rate :
|
0.00000
|
Cusecs
|
|
|
|
|
|
|
|
|
|
|
Spillway Gates Opening
|
|
Gate No.
|
Opening (Mtrs.)
|
|
Gate 1
|
0.00
|
|
Gate 2
|
0.00
|
|
Gate 3
|
0.00
|
|
Gate 4
|
0.00
|
|
Gate 5
|
0.00
|
|
Gate 6
|
0.00
|
|
Gate 7
|
0.00
|
|
Gate 8
|
0.00
|
|
Gate
9
|
0.00
|
|
Gate
10
|
0.00
|
|
Gate
11
|
0.00
|
|
|
|
|
|
|
|
|
Dam Site Weather Station Details
|
|
Wind Speed (m/s):
|
1.57
|
Humidity: (%)
|
46.90
|
|
Wind Direction (°N):
|
189
|
Solar Radiation (w/m2) :
|
748
|
|
Atmospheric Pressure (hpa) :
|
999.50
|
Todays Rain (mm) :
|
0.00
|
|
Temperature (°C):
|
26.00
|
Total Rain (mm) :
|
538.18
|
|
|
|
|
|
|
|
|
|