Maudaha Dam Automation Project
|
Current Data Report
|
Data is Updated on:
14/6/2025 at 5:25:59
|
|
Dam Parameters
|
Reservoir U/S Level :
|
144.60
|
Mtrs.
|
Reservoir D/S Level :
|
128.58
|
Mtrs.
|
Gross Contents :
|
98.4000
|
McuM
|
Live Contents :
|
77.4000
|
McuM
|
% Live Contents
:
|
43.2400
|
%
|
Discharge Rate :
|
6.92700
|
Cusecs
|
|
|
|
|
|
|
|
Spillway Gates Opening
|
Gate No.
|
Opening (Mtrs.)
|
Gate 1
|
0.00
|
Gate 2
|
0.00
|
Gate 3
|
0.00
|
Gate 4
|
0.00
|
Gate 5
|
0.00
|
Gate 6
|
0.07
|
Gate 7
|
0.00
|
Gate 8
|
0.00
|
Gate
9
|
0.00
|
Gate
10
|
0.00
|
Gate
11
|
0.00
|
|
|
|
|
|
|
Dam Site Weather Station Details
|
Wind Speed (m/s):
|
5.21
|
Humidity: (%)
|
32.90
|
Wind Direction (°N):
|
204
|
Solar Radiation (w/m2) :
|
725
|
Atmospheric Pressure (hpa) :
|
978.50
|
Todays Rain (mm) :
|
0.00
|
Temperature (°C):
|
39.60
|
Total Rain (mm) :
|
393.00
|
|
|
|
|
|
|
|